Salient Features of Sardar Sarovar Project

      Hydrology and Reservoir:

Hydrology:
1) Total Catchment of Narmada 97410 Sq.Km.

MP

85859 Sq.Km(86.9%)

Maharashtra

1658 Sq.Km.(1.6%)

Gujarat

9894 Sq.Km.(11.5%)
2) Catchment area at dam site 88000 Sq. Km
3) Length of river in Madhya Pradesh 1077 Km
4) Length upto dam site 1163.5 Km
5) Mean Annual Rainfall 1120 mm

Reservoir:
1)Length 214 Km
2)Maximum Width of Reservoir 16.1 Km
3)Average Width of Reservoir 1.77Km
4)FRL 138.68m(455 ft)
5)MDDL 110.63m(363 ft)
6)Gross Storage 9500 Mcum(7.70 MAF)
7)Live Storage 5800 Mcum(4.73 MAF)
8)Annual Evaporation Loss 616 Mcum(0.5 MAF)