Salient Features of Sardar Sarovar Project


  Narmada Main Canal System:

Narmada Main Canal System:

1.Length

458 Km in Gujarat
74 Km in Rajasthan

2.Capacity at head 1132.66 cumec (40000 cusec)
3..Capacity at trail 75 cumec (2500 cusec) for Rajasthan

4.Base Width At head

73.1m

5.Full Supply Depth (FSD) At head

7.6m

6.Side Slope 2:1
7.Bed Slope

1:12500 upto Km 144.5 and
1:15500 upto border.

8.Fully supply level 91.45 m (300 ft)
9.Branch Canal 42 nos.
10.Distributary Length 7500 Km
11.Total length of distribution system including Field channel

75000Km

12.Main Canal structures
Canal Syphon
Drainage syphone
Canal crossing
Syphon aquaduct
Main Canal Level
Regulator
Cross Regulator
Escapes
Super passage
Road bridge
Railway crossing

 
590
14
148
25
5

42
39
13
6
280
17

13.Lining M-15 cement concrete 10 cm thick on bed and 12.5 cm on sides.
Irrigation:
1. CCA 21.29 lakh ha.
2. Annual irrigation 17.92 lakh ha. (Gujarat-12 districts)

Drinking Water:

1. Allocation

1307 Mcum (1.06 Maf) in Gujarat
8 Mcum in rajasthan

2. Industrial use in Gujarat 275 Mcum(0.21 Maf)
3. Drinking water use in Gujarat 1032 Mcum (0.85 Maf)
4. Urban Centres benefitted 135
5. Villages benefitted 8215