1) Sardar Sarovar Reservior Regulation Committee :       

Composition:
1. Member (Power), NCA        Chairman
2 Member (Civil)   Member
3. Member (Power)   Member
4. Director, HP&I Division,CEA   Member
5. Chief Engineer, NTBO, CWC    Member
6. Member (Engg.), NVDA    Member
7. Secretary (Narmada) GoG     Member
8. Chief Engineer & Addl. Secretary Irrigation Deptt. GoR Member
9. Chief Engineer, Koyna Project, GoM  Member
10. Chief Engineer, (RO),NCA Member

.      Functions:

  1. Releases Ex. Maheshwar and likely inflows/water level in the Sardar Sarovar Reservoir during the corning month.
  2. Preparation of working table for operation of Sardar Sarovar Reservoir.
  3. Irrigation requirements of GOG & GOR during the coming month (weekly/ten days).
  4. Requirement for operation of IBPT, if any, to meet the requirement of irrigation of GOG/GOR and assessment of likely loss of power due to running of IBPT.
  5. Permitted  withdrawas for irrigation.
  6. Requirement of water use downstream of Sardar Sarovar Project (Mandatory/against the indent of GOG).
  7. Likely generation of power through CHPH and Rbph during the month.

  

Constituted by NCA in its 73th meeeting held in 8.12.2004

 

Close Window